Skip to Content
Sonoma Public Infrastructure (formerly TPW)

News Index


December 14, 2015 | Sonoma Public Infrastructure (formerly TPW)

Roads Maintenance Update 12-14-15

This week, road crews will be working on Green Valley Road and Bodega Highway, and performing regular maintenance around the county. Read full story


December 04, 2015 | Sonoma Public Infrastructure (formerly TPW)

Clearing Culverts and Preparing for Rain

This week we completed clearing a crossing at Adobe Creek and Casa Grande Road near Petaluma, in preparation for winter rains and El Nino. View the before, during, and after of this significant project. Read full story


November 24, 2015 | Sonoma Public Infrastructure (formerly TPW)

Free Rides for College Students and Veterans Extended After Successful Pilot Program

Sonoma County increased access to essential services and reduced greenhouse gas emissions with over 200,000 trips made by Veterans and Sonoma County College Students in 2015 Read full story


November 23, 2015 | Sonoma Public Infrastructure (formerly TPW)

Roads Maintenance Update 11-23-15

This week, road crews will be removing summer crossings at Asti and Odd Fellow, striping and marking pavement,performing erosion control, patching potholes, and running mowers. Read full story


November 16, 2015 | Sonoma Public Infrastructure (formerly TPW)

Roads Maintenance Update

This week crews will be responding to a downed tree after the weekend's high winds, removing the Asti Summer Crossing, crack sealing and drainage work, along with some culvert cleaning in the Cotati area, and other services. Read full story


November 16, 2015 | Sonoma Public Infrastructure (formerly TPW)

Board of Supervisors Dedicates $13.5 Million for Roads

Press Release  On Tuesday, November 10th, the Sonoma County Board of Supervisors approved new one-time funding that will help build approximately 100 miles of new roads. The Board added $13.5 million of funding, which brings the total general fund contribution to roads to a record $25 million. New roads projects will be selected in 2016 and built in 2017. The Board also reinforced their commitment to stable, ongoing funding by indexing the annual general fund contribution toward road repair by up to 2% annually. Read full story


September 28, 2015 | Sonoma Public Infrastructure (formerly TPW)

Use “SoCo Connect” to report issues and request repairs

SoCo Connect is the County's new road issue reporting system, a website and smartphone app that allows residents to report issues (potholes, etc.) and check back in to monitor progress. Read full story


June 10, 2015 | Sonoma Public Infrastructure (formerly TPW)

Bid Results: 2015 Asphaltic Emulsion Seal Coat - M15201

The work to be done consists, in general, of providing and applying polymer modified rejuvenating emulsion seal coat to County roads and such other items or details, not mentioned above, that are required in this proposal to be performed, placed, constructed or installed. Bids are required for the entire work described herein. Read full story


June 10, 2015 | Sonoma Public Infrastructure (formerly TPW)

Bid Results: 2015 Asphaltic Emulsion Seal Coat - M15201

The work to be done consists, in general, of providing and applying polymer modified rejuvenating emulsion seal coat to County roads and such other items or details, not mentioned above, that are required in this proposal to be performed, placed, constructed or installed. Bids are required for the entire work described herein. Read full story


June 10, 2015 | Sonoma Public Infrastructure (formerly TPW)

Invitation for Bid: 2015 Asphaltic Emulsion Seal Coat - M15201

The work to be done consists, in general, of providing and applying polymer modified rejuvenating emulsion seal coat to County roads and such other items or details, not mentioned above, that are required in this proposal to be performed, placed, constructed or installed. Bids are required for the entire work described herein. Read full story