• M09000 - Canyon Rd 1

Roadway & Bridge Surface Preservation Program

Project # M09000

Status: Complete

Project Description

Roadway

Placement of polymer modified asphalt rubber chip seal, on various County Roads together with associated flagging and traffic control required to construct the work, and such other items or details, not mentioned above, that are required by the Standard Specifications, or these Special Provisions shall be performed, placed, constructed or installed. 

Bridge

Cleaning expansion joints and replacing joint seals, cleaning bridge decks, treating bridge decks with methacrylate resin, repairing spalled concrete, and removing remnants of an original epoxy overlay at various locations, and such other items or details, not mentioned above, that are required by the Standard Specifications, or these Special Provisions shall be performed, placed, constructed or installed.

Documents

View/Download Bid Results (PDF)

Location (Roads)

  • Alexander Valley Road (9902), postmile 10.07 to 13.43
    • Healdsburg Avenue to Highway 128
  • Armstrong Woods Road (8902B), postmile 10.00 to 11.85
    • Sweetwater Springs Road to Highway 116
  • Canyon Road (0003), postmile 10.00 to 12.15
    • Dry Creek Road to Highway 101
  • Dry Creek Road (9901), postmile 10.30 to 20.42
    • Healdsburg City Limit to Dry Creek Bridge
  • Healdsburg Avenue (99034A), postmile 10.00 to 10.68
    • Lytton Springs Road to Lytton Station Road (#99035)
  • Old Redwood Highway (7812), postmile 10.68 to 14.51
    • Mendocino Avenue to Shiloh Road
  • Petrified Forest Road (8801C), postmile 20.19 to 22.55
    • Porter Creek Road to Napa County Line
  • River Road (8802B), postmile  10.10 to 17.23
    • Highway 116 to Argonne Way (skipping work @ Eagles Nest)
  • Westside Road (8001), postmile 16.70 to 22.36
    • Sweetwater Springs Road to Healdsburg City Limit

Location (Bridges)

  • Pierson Street at Santa Rosa Creek (20C0420)
  • River Road at Big Sulphur Creek (20C0251)
  • Corona Avenue at Petaluma River (20C0299)
  • Main Street at Dutch Bill Creek (20C0159)
  • Todd Road at Colgan Creek (20C0201)
  • Bodega Hwy at Salmon Creek (20C0078)
  • Todd Road at Laguna de Santa Rosa (20C0200)
  • Stony Point Road at Laguna de Santa Rosa (20C0274)
  • Fulton Road at Mark West Creek (20C0341)
  • Llano Road at Laguna de Santa Rosa (20C0233)
  • Lowell Avenue at Gossage Creek (20C0273)
  • Millbrae Avenue at North Branch Laguna de Santa Rosa (20C0277)
  • Stony Point Road at Gossage Creek (20C0501)
  • River Road at Hill Along Russian River (20C0529)
  • River Road at Hill Along Russian River (20C0530)
  • Arnold Drive at Carriger Creek (20C0212)
  • Leveroni Road at Sonoma Creek (20C0171)
  • River Road at Green Valley Creek (20C0156)
  • Guerneville Road at Laguna de Santa Rosa (20C0052)
  • Yoakim Bridge Road at Dry Creek (20C0106)

Timeline

  • Bid Date: August 20, 2009
  • Work Completed: Summer, 2010
  • Official Notice of Completion: October 15, 2010

Contact Information

Business Hours
Monday – Friday
8:00 AM – 5:00 PM

By Appointment Only.  Responding 24x7 to Emergencies.

Contact us by Phone
Office Location
La Plaza B
2300 County Center Drive
Suite B 100
Santa Rosa, CA 95403
38.462023, -122.725381

Road Paving Projects

Sonoma County Pavement Preservation Program

75x75_PavementStripe

See information about road paving projects in unincorporated Sonoma County.

Sonoma County Bridges

See More Information

SimpleBridge1

See information about Sonoma County's Bridge Maintenance & Retrofit program.