Permit and Resource Management Department Banner

Public Review Draft Local Coastal Plan

Separate Chapter/Sections of Complete Plan

Figures/Maps

Figure/MapDescriptionFile Size
C-LU-1a thru 1kLand Use15.09 MB
C-AR-1a thru 1kAgricultural Resources11.99 MB
C-OSRC-1a thru 1kDesignated Scenic Resource Areas10.81 MB
C-OSRC-2a thru 2kEnvironmentally Sensitive Habitat Areas9.44 MB
C-WR-1a thru 1cWatersheds and Subwatersheds3.13 MB
C-WR-2a thru 2cGroundwater Basins2.49 MB
C-PS-1a thru 1cSeismic Geologic Hazards2.82 MB
C-PS-2a thru 2cSlope Instability Hazards3.17 MB
C-PS-3a thru 3kTsunami and Sea Level Rise Hazards11.45 MB
C-PS-4a thru 4cCoastal Exposure Threat2.56 MB
C-PS-5a thru 5cRole of Natural Habitat2.34 MB 
C-PS-6a thru 6cWildland Fire Threat2.54 MB
C-CT-1a thru 1cRoad and Bikeway Classification2.39 MB
C-PF-1a thru 1cSchool Districts2.26 MB
C-PF-2a thru 2cFire Districts2.22 MB
C-PA-1a thru 1kPublic Access9.25 MB

Back to top

Policy Comparison Tables

The following are policy comparison tables to assist in comparing the current (2001) Local Coastal Plan to proposed policies in the Public Review Draft. 

Back to top

Fact Sheets

Public Review Draft (PDF: 2 MB)

Agriculture (PDF: 2 MB)

Housing (PDF: 2 MB)

Public Access (PDF: 1 MB)

Printed Version

Printed copies of the Draft are available for your review at Permit Sonoma, in the reference area of Sonoma County public library branches, and at the public locations listed below: 

Bodega Bay Post Office
537 Smith Brothers Road
Bodega Bay, CA 94923

Duncans Mills Post Office
25375 Steelhead Boulevard
Duncans Mills, CA 95430

Jenner Post Office
10439 Highway 1
Jenner, CA 95450

Monte Rio Post Office (Northwood)
19420 CA-116
Monte Rio, CA 95462

The Sea Ranch Post Office
60 Sea Walk Drive
Sea Ranch, CA 95497

Public Review Draft Archive

Where We Are Now

1Step 1 - Complete

Project Launch

2Step 2 - Complete

Preliminary Draft

3Step 3 - Complete

Public Workshops (Preliminary Draft)

4Step 4 - Complete

Public Review Draft

5Step 5 - Complete

Public Workshops (November 2019-January 2020)

6Step 6 - Incomplete

Planning Commission Hearings (February-March 2020)

7Step 7 - Incomplete

Board of Supervisors Hearings (Spring 2020)

8Step 8 - Incomplete

Coastal Commission Hearings (Summer 2020)

9Step 9 - Incomplete

Certification

Coastal Zone

Local Coastal ZoneView full size map (PDF: 746 kB)