2017 Fire Damaged Street Lighting (W18006)
General Work Description:
Project Description: The work to be done consists, in general, of installing pull boxes, removing and replacing curb and gutter, removing and replacing sidewalk, removing and replacing sidewalk warp, removing and replacing street lighting, trenching of various County roads together with associated flagging, traffic control and preparation required to construct the work, and such other items or details, not mentioned above, that are required by the Standard Specifications, or these Special Provisions will be performed, placed, constructed or installed.
Project Location: The project site is located in the Mark West Springs Subdivision and Golf Course Subdivision.
General Information:
Engineer’s Estimate: $516,289.25.
Working Days: 60.