  • Removal of approximately seventeen (17) eucalyptus trees, stump grinding, and pruning of approximately seventy two (72) eucalyptus trees.
  • Traffic signal installation, road widening, curb, gutter, sidewalk, pavement overlay and pavement delineation, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications
  • Road surface overlay, shoulder widening, construction of retaining walls and guard rail, and such other items or details that are required by the Plans and Standard Specifications.
  • Construction of 900 linear feet of 5-foot wide asphalt concrete pedestrian pathway, separated from the roadway by an asphalt concrete berm on the west side of Burbank Avenue from Hughes Avenue to Sebastopol Road and approximately 2,500 linear feet of pedestrian pathway extending south from the school parcel along the easterly side to the existing cross walk at Hearn Avenue.
  • Repair and reconstruction of roadway damaged by landslide.
  • Modification of the storm drain system, constructing or replacing curb, gutter and sidewalk, reconstruct driveway, asphalt dike, and full depth asphalt concrete shoulder concrete shoulder widening on Western Avenue, overlay, and such other items or details that are required by the Plans and Specifications.
Sorting Options

Contact Information

Contact us by Phone
Address
La Plaza B
2300 County Center Drive
Suite B 100
Santa Rosa, CA 95403
38.462006, -122.725384

Find Archived Construction Projects

Measure M

See information about the Measure M Sales Tax

75x75_MeasureM_Square

Read more about the Traffic Relief Act, passed by Sonoma County voters in 2004.