Landfill - Survey Sight 1

2011 Construction Projects

Showing: 16 of 6

  • Placement of polymer modified asphalt rubber chip seal, and slurry seal on various County Roads, together with associated flagging and traffic control required to construct the work.
  • Overlays of various County roads including but not limited to asphalt concrete overlay of roadway, adjusting utility covers, adjusting guard rails, applying striping installing delineators, repairing pavement structural section, cold planing, shoulder backing, asphalt dikes, parking bumpers, and such other items or details, not mentioned above, that are required by the plans and standard specifications.
  • Construction of earthquake upgrades for portions of the Annapolis Road Bridge over the Wheatfield Fork of the Gualala River.
  • Construction of a pipe headwall and screened inlet on the Carriage Lane storm drainage system.
  • Widening the shoulder area of State Route 12 in front of the proposed Las Palmas subdivision at 17310 Highway 12 in the Fetters Hot Springs community; removal of trees and vegetation on the westerly side of State Route 12; constructing 2100 cubic yards of embankment; removal of a small headwall and the extension of a drainage culvert.
  • Removal of approximately 24 eucalyptus trees; stump grinding, and pruning of approximately 4 eucalyptus trees.
Sorting Options

Contact Information

Contact us by Phone
Address
La Plaza B
2300 County Center Drive
Suite B 100
Santa Rosa, CA 95403
38.462006, -122.725384

Find Archived Construction Projects

Measure M

See information about the Measure M Sales Tax

75x75_MeasureM_Square

Read more about the Traffic Relief Act, passed by Sonoma County voters in 2004.